The Wednesday working bees have been preparing the ground for the autumn planting. The four main target areas are;1/ South of the walk bridge where the Glyceria has been sprayed off and the Willows trimmed back.
2/ Mass planting of Kahikatea and Astelia that we have raised ourselves are to go under the canopy from the board walk north.
3/ The gully side at the back of Sexton Road where the three Kauri are (behind No. 43).
4/ Under-canopy planting on the drier gully sides of 148 Kawakawa Macropiper excelsum that we have grown from seed. These are frost tender so we will be picking sheltered sites.



During one of our storms last month a Kanuka, down from the walk bridge, was blown over. When cutting it up for removal (firewood) it was noticed that there was a large Weta hole in the trunk. That section was kept aside and made into a Weta hotel. The Weta was coaxed out with a piece of apple as a lure, stored among forest litter in a shoe box while the trunk was converted, then reintroduced and installed back onto a tree in the gully.

Yes it has been a month of building accommodation for our fauna. On advice from Waikato Regional Council Fish Scientist we have started installing accommodation to attract more native fish to our stream. Four concrete block hotels were installed in ponds in the gully behind Sexton Road. The target fish are Giant and Banded Kokopu.
Work continued over the last month to upgrade the Sexton Road end of the track. A set of steps was built, retaining work was done on the downhill track and the track was extended over the soft mud area using heavy grade rubber tracking from an earth moving machine as a base. HCC supplied all the timber. Well worth a look if you are out walking.